Agricultural land of 5,713 m2 in Radanovac
New construction
Tel: 024 554 494
[email protected]
Agricultural land of 5,713 m2 in Radanovac
Terraced house in an excellent location in Kertvaros. The total area of 132m2 is spread over three floors. On the ground floor there is a living room with a dining room and a kitchen that leads to a large terrace overlooking the back yard, as well as a toilet. On the first floor there are larger and smaller bedrooms and a bathroom. There are utility rooms in the basement. You can park your car in the yard in front of the house. The floors are parquet and tiles, the windows are wooden, and the heating is gas.
In Radanovac, on an asphalted street, a legalized residential and commercial building of recent construction in 2000 is for sale and it has a fully equipped residential house, and in the rear part a production facility, also registered with industrial electricity 100A, exit to two streets with a large overpass and an office area in the attic of the production building, as well as a warehouse for finished goods. The house is 104 m2 and the other buildings are about 540 m2, The house can easily be turned into a production part of the building or office space, etc... The building is currently producing metal products and equipment. The area of the plot is 1183 m2. The house consists of three rooms, a bathroom and a veranda. The windows in the house are PVC, the floors are laminate and tiles, and the heating is on a stove. The business building consists of several auxiliary and production rooms, as well as an office with a wide corridor, 5 separate rooms, a mini kitchen and a toilet. There is gas in the street. The price is not fixed.
Apartment in a new building, 69,14m2 consisting of living room with kitchen and dining room,two bedroom,bathroom and toilets. The apartment will have underfloor heating on gas with low maintenance costs, high-quality aluminium joinery with three-layer low-emission glass and PVC external blinds. The walls are made of thermoblocks with the highest insulating properties + facade insulation. Partition walls are made of brick. The floors will have Tarket floor coverings in the rooms and dining room, and Class I ceramics in the bathrooms and kitchen. In the bathroom, shower screens made of tempered glass and linear sinks and built-in cisterns. The apartment will have a security entrance door, optical Internet connection, intercom and air conditioning installations.
Apartment in a new building, 54,42m2 consisting of living room with kitchen and dining room,two bedroom,bathroom. The apartment will have underfloor heating on gas with low maintenance costs, high-quality aluminium joinery with three-layer low-emission glass and PVC external blinds. The walls are made of thermoblocks with the highest insulating properties + facade insulation. Partition walls are made of brick. The floors will have Tarket floor coverings in the rooms and dining room, and Class I ceramics in the bathrooms and kitchen. In the bathroom, shower screens made of tempered glass and linear sinks and built-in cisterns. The apartment will have a security entrance door, optical Internet connection, intercom and air conditioning installations.
Apartment in a new building, 54,92m2 consisting of living room with kitchen and dining room,two bedroom,bathroom. The apartment will have underfloor heating on gas with low maintenance costs, high-quality aluminium joinery with three-layer low-emission glass and PVC external blinds. The walls are made of thermoblocks with the highest insulating properties + facade insulation. Partition walls are made of brick. The floors will have Tarket floor coverings in the rooms and dining room, and Class I ceramics in the bathrooms and kitchen. In the bathroom, shower screens made of tempered glass and linear sinks and built-in cisterns. The apartment will have a security entrance door, optical Internet connection, intercom and air conditioning installations.
Apartment in a new building with an area of 44,80 m2, consisting of a living room with a kitchen and dining room, a bedroom, a bathroom and a terrace. The building is made of thermoblocks with the highest insulating properties + insulation of a facade. The partition walls will be built of bricks. Tarket floor coverings in the rooms and dining room, and Class 1 ceramics in the kitchen and bathroom. Shower screen made of tempered glass, a linear drain and a built-in boiler. The apartment will have a security door, optical Internet connection, intercom and air conditioning installations. Deadline for completion is the last quarter of 2027.
Apartment in a new building with an area of 38,04 m2, consisting of a living room with a kitchen and dining room, a bedroom, a bathroom and a terrace. The building is made of thermoblocks with the highest insulating properties + insulation of a facade. The partition walls will be built of bricks. Tarket floor coverings in the rooms and dining room, and Class 1 ceramics in the kitchen and bathroom. Shower screen made of tempered glass, a linear drain and a built-in boiler. The apartment will have a security door, optical Internet connection, intercom and air conditioning installations. Deadline for completion is the last quarter of 2027.
Apartment in a new building with an area of 37.62 m2, consisting of a living room with a kitchen and dining room, a bedroom, a bathroom and a terrace. The building is made of thermoblocks with the highest insulating properties + insulation of a facade. The partition walls will be built of bricks. Tarket floor coverings in the rooms and dining room, and Class 1 ceramics in the kitchen and bathroom. Shower screen made of tempered glass, a linear drain and a built-in boiler. The apartment will have a security door, optical Internet connection, intercom and air conditioning installations. Deadline for completion is the last quarter of 2027.
Apartment in a new building with an area of 43.27 m2, consisting of a living room with a kitchen and dining room, a bedroom, a bathroom and a terrace. The building is made of thermoblocks with the highest insulating properties + insulation of a facade. The partition walls will be built of bricks. Tarket floor coverings in the rooms and dining room, and Class 1 ceramics in the kitchen and bathroom. Shower screen made of tempered glass, a linear drain and a built-in boiler. The apartment will have a security door, optical Internet connection, intercom and air conditioning installations. Deadline for completion is the last quarter of 2027.